检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电第七工程局一分局,四川彭山620860
出 处:《四川水力发电》2007年第A01期15-18,共4页Sichuan Hydropower
摘 要:近几年来,挤压式混凝土边墙施工技术在国外已经广泛应用于混凝土面板坝施工中。这项技术因其能明显提高垫层料的压实质量,以及简便、及时地提供上游坡面的防护等特点,已引起世界各国的广泛关注。我国在青海公伯峡水电站首先应用了这种新方法。虽然此项技术已应用于多个工程,但不同工程因其挤压边墙施工中挤压机存在的问题及改进方法不尽相同,相应的处理方式也存在差异。就边墙挤压机在马来西亚巴贡水电站工程的应用实例,简要阐述了边墙挤压机在混凝土面板坝施工中的应用。Over last years,concrete sidewall extruding construction technique has been widely applied in concrete face reckfill dam construction in other countries.This technique is more and more concerned by many countries in the world because it is used so as to significantly improve compaction of bedding materials and easily and properly provide protection for upstream slope face.This new method was firstly applied in Gongboxia hydropower station in Qinghai Province of China.This technique has been used for several projects,but respective treatment is different due to various problems in extruders used in sidewall construction and distinct improvements needed to be made for separate project.In this paper,in the case of Bakun hydropewer station in Ma- laysia,application of sidewall extruder in construction of concrete face rockfill dam is briefly described.
分 类 号:TV536[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117