富铟高铁硫化锌精矿加压浸出液沉铟后溶液净化除铁研究  被引量:5

Study on Removal of Iron from Pressure Acid Leaching Liquor of Zinc Sulfide Concentrate Precipitated Indium

在线阅读下载全文

作  者:彭建蓉[1] 王吉坤[1] 杨大锦[1] 阎江峰[1] 

机构地区:[1]云南冶金集团总公司技术中心,云南昆明650031

出  处:《湿法冶金》2007年第2期88-91,共4页Hydrometallurgy of China

摘  要:研究了用针铁矿法从高铟铁硫化锌精矿加压浸出液沉淀铟后的溶液中除铁,分别考察了时间、锰粉用量、氧气浓度等对除铁效果的影响。结果表明,利用高铟高铁硫化锌精矿加压氧化酸浸时排出的尾气及3~5g/L锰粉,在85~90℃温度下氧化3~4h,可以将溶液中的铁离子质量浓度从12.9g/L降到10mg/L以下,除铁率达99.9%以上,同时可充分利用尾气中的氧和热量降低生产成本。Laboratory-scale experiments about removal of iron from pressure acid leaching liquor of iron-rich zinc sulfide concentrate precipitated indium by goethite process were performed. The effect of reaction time, oxygen concentration and dosage of manganese oxide on removal of iron was investigated. Experimental results indicate that removal of iron exceeds to 99.9% (from 12.9 g/L to 10 mg/L ) under optimum conditions: dosage of manganese oxide of 3-5 g/L, reaction temperature of 85-90℃ and reaction time of 3-4 h. Lower production cost is achieved because the heated oxygen from used gas during pressure acid leaching can be reused.

关 键 词:高铟高铁硫化锌精矿 浸出液 针铁矿法 除铁 

分 类 号:TF843.1[冶金工程—有色金属冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象