检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽宁省高等级公路建设局,沈阳110003 [2]辽宁省交通勘测设计院,沈阳110005
出 处:《北方交通》2007年第5期23-25,共3页Northern Communications
摘 要:形成优良石渣路基结构的关键在于有效的压实。结合沈大路改扩建工程实例,将碾压工艺与压实过程动态监控技术结合起来,对石渣路基的压实程度与动态监控问题进行了试验研究。根据动态监控结果,及时调整了碾压工艺,进行了工程反馈处理,保证了石渣路基的施工质量。The Key to form a fine structure of rock ballast subgrade lies in a valid compaction. By examples of rcconstrucion and extension engineerings on Shen - Da Freeway, the paper combines the rolling technology with the dynamic monitoring technique in the process of compaction, conducts testing study of the extent of rock ballast sub- grade compacting and the dynamic monitoring matters. Based on results of dynamic monitoring, the rolling technology is regulated in time and the treatments for feedback are carried out, ensuring the quality of rock subgrade in the construction.
分 类 号:U415.521[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.36