检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江水利委员会水文局汉江水文水资源勘测局,湖北丹江口442700
出 处:《水文》2007年第3期53-56,共4页Journal of China Hydrology
基 金:国家重点基础研究发展计划资助(或"973"计划)项目(No.:2003CB415205)
摘 要:汉江干支流上多座水利枢纽工程的修建,使汉江众多水文站由天然水文进入受水利工程影响的环境水文,其水文情势完全受人工调节,水文要素之间关系复杂多变,这给水文测验和成果计算带来了很大的难度。为此,我们研究出了适合受汉江水利工程影响的环境水文测验方法,提出了水库下游测站输沙模数采用当年入库输沙量加区间来沙计算公式。其测验方法可供同类测站参考。Due to construction of water structures on the main stream and tributaries of the Hanjiang River, the natural hydrological condition monitored by hydrological stations has become in environmental hydrologic regime, which means the hydrological condition is now under the control of human interference and the relationship between hydrological elements is various and complicated, so that it is difficult to make hydrometry and calculation. This paper introduced several methods for hydrometry under the condition of water structures on the Hanjiang River and provided a formula for calculating sediment runoff modulus.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.79.7