检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:ZHOU Chuan-bo YAO Ying-kang GUO Liao-wu YIN Xiao-peng FAN Xiao-feng SHANG Ying
机构地区:[1]Engineering College, China University of Geosciences, Wuhan, Hubei 430074, China [2]Ming Company of Wuhan Steel and Iron Unite Company, Wuhan, Hubei 430080, China
出 处:《Journal of China University of Mining and Technology》2007年第2期295-300,共6页中国矿业大学学报(英文版)
摘 要:The mechanism of stress generation and propagation by detonation loading in five separate independent advance of ore breaking patterns is discussed in the paper. An elastic numerical model was developed using AN- SYS/LS-DYNA 3D Nonlinear Dynamic Finite Element Software. In this package ANSYS is the preprocessor and LS-DYNA is the postprocessor. Numerical models in the paper to actual were l:10 and the element mesh was dissected in scanning mode utilizing the symmetry characteristics of the numerical model. Five different advance rates were studied. Parameters, such as the time required to maximum stress, the action time of the available stress, the maximum velocity of the nodes, the stress penetration time, the magnitude of the stress peak and the time duration for high stress were numerically simulated. The 2.2 m advance appeared optimum from an analysis of the simulation results. The results from numerical simulation have been validated by tests with physical models.The mechanism of stress generation and propagation by detonation loading in five separate independent ad-vance of ore breaking patterns is discussed in the paper. An elastic numerical model was developed using AN-SYS/LS-DYNA 3D Nonlinear Dynamic Finite Element Software. In this package ANSYS is the preprocessor and LS-DYNA is the postprocessor. Numerical models in the paper to actual were 1:10 and the element mesh was dissected in scanning mode utilizing the symmetry characteristics of the numerical model. Five different advance rates were stud-ied. Parameters,such as the time required to maximum stress,the action time of the available stress,the maximum ve-locity of the nodes,the stress penetration time,the magnitude of the stress peak and the time duration for high stress were numerically simulated. The 2.2 m advance appeared optimum from an analysis of the simulation results. The re-sults from numerical simulation have been validated by tests with physical models.
关 键 词:non-pillar sublevel caving method independent advance of ore breaking numerical simulation model test
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7