工程延误慎言“罚”  

On penalty for delay of works

在线阅读下载全文

作  者:杨志勇[1] 高景泉 

机构地区:[1]河海大学商学院,江苏南京210098 [2]浙江水专工程建设监理有限公司,浙江杭州310016

出  处:《水利经济》2007年第3期51-52,77,共3页Journal of Economics of Water Resources

摘  要:针对工程合同条款中经常出现的发包人对承包商误期违约“罚款”条款,分析了罚款、惩罚性赔偿和惩罚性违约金的法律性质,认为在合同中约定罚款难以得到法律的保护,只有在合同中清晰、准确地约定误期违约责任的性质,发包人才能快速获得赔偿,避免发生争议。With regard to the penalty clauses,which prescribe that the contractors shall pay to the employers,for delay of works in the works contracts,the legal characters of penalty,punitive damages and penalty for breach of contracts are analyzed.It is regarded that the penalty stipulations in the contracts are difficult to be protected by laws,only is the character of delay or breach of contracts clearly stipulated in the contracts,the contractors can rapidly get their damages,and thus possible disputes will be avoided.

关 键 词:工程延误 误期赔偿 罚款 惩罚性赔偿 惩罚性违约金 

分 类 号:TV512[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象