检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水利水电工程学院,江苏南京210098
出 处:《水力发电》2007年第6期65-68,共4页Water Power
基 金:国家自然科学基金项目资助(50379005)
摘 要:当前,在我国西部高山峡谷地区修建了许多大型水电工程,高压引水隧洞结构也得到广泛应用。但由于水工高压引水隧洞的环境条件和工作机理复杂,在隧洞衬砌开裂后的裂缝间距与宽度、高压内水外渗及水荷载、计算分析方法等方面,仍然存在不少问题没有得到很好的解决。在对这些问题的研究现状进行总结分析的基础上,指出需要进一步研究的课题。Deep tunnel is a kind of structure widely used to huge hydraulic projects built in west of china. Although it possesses several particular advantages, many problems has not been successfully solved due to the complexity of its working environment and mechanism, such as quantitative analysis on the width and spacing of cracking of tunnel liner, the seepage load induced by the seepage from pressure tunnel and the selection of computation method. In this paper, the state of art of studies on the existing problems is summed up, and scientific issues on deep tunnels needed further research are pointed out at the same time.
关 键 词:有压隧洞 裂缝 钢筋混凝土衬砌 耦合分析 引水隧洞
分 类 号:TV732.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28