灌南县人民桥施工全过程仿真分析  

Numerical Simulation of the Construction Process for a RC Continuous Girder Bridge

在线阅读下载全文

作  者:吴星 李鸿晶[2] 伍小平 

机构地区:[1]连云港市亚欧交通工程咨询监理有限公司,江苏连云港222500 [2]南京工业大学土木工程学院,江苏南京210009 [3]上海建工(集团)总公司,上海200050

出  处:《江苏建筑》2007年第3期34-36,共3页Jiangsu Construction

摘  要:以灌南县人民桥为例,讨论了三跨预应力混凝土连续梁桥施工全过程仿真分析的建模依据及建模过程,并对结果进行分析,计算出理论预拱度,以指导该桥的施工线形控制。The construction process of a presstressed concrete continuous girder bridge, Renmin Bridge located in Guannan County, is simulated numerically in this paper. The modeling of the bridge structure is established and checked based on the finite element method, then the time varying responses are analyzed during every construction stage based on the data recorded from existed parts of the structure. The analysis results are used to control the constmction quality and safety of the bridge.

关 键 词:预应力混凝土连续梁桥 施工全过程仿真分析 理论预拱度 

分 类 号:U422.39[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象