烧成系统废气处理工艺计算及配置  被引量:2

Dealing With Waste Gas From Firing System: Technical Calculation and The Configuration

在线阅读下载全文

作  者:李小莉 刘东莱 

机构地区:[1]浙江中材工程设计研究院有限公司,浙江杭州310000

出  处:《水泥工程》2007年第3期9-16,共8页Cement Engineering

摘  要:烧成系统废气处理的工艺设计优劣,直接影响除尘效果的好坏和能源效益的高低,因此合理的工艺计算和系统配置非常重要。文章详细地介绍了废气增湿塔的喷水量计算方法;探讨了立磨系统增湿塔的合理位置、风机的节能运行以及尾卸或中卸磨系统的工艺设计;同时对增湿塔系统的自控操作也进行了分析研究。Dedusting effect and energy efficiency of the firing system depends on the technical design of its waste gas processing system, and then reasonable technical calculation and system allocation is very important. The paper introduced in detail the calculating method of the water quantity sprayed into the waste gas conditioning tower, and discussed the reasonable position of the gas conditioning tower, saving energy running of the fan and technical design of the end and middle discharge mill system, at the same time, studied the autocontrol operation of the gas conditioning tower system.

关 键 词:窑尾废气处理 在线操作 离线操作 增湿塔 风机 喷水量 

分 类 号:TQ172.9[化学工程—水泥工业]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象