检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南交通工程职业技术学院交通工程系,衡阳421001 [2]南华大学城市建设学院,衡阳421001
出 处:《建筑结构》2007年第6期69-70,共2页Building Structure
摘 要:运用有限元法研究了地下连续墙深基坑开挖工程中,用预灌浆的方法加固部分将被挖去的软土,灌浆施工对地下连续墙及邻近土体变形的影响。理论及实测结果比较表明,将地下连续墙与灌浆加固相结合的方法减小了地下连续墙的变形,增加了基坑开挖的稳定性。The analysis using the finite element method was conducted to model the construction of the jet grout slab which has effect on underground retaining walls and nearby soils in the deep foundation pit excavation of underground retaining wall. The calculated results and the factual results are also compared. The results show that the method could decrease the deformation of underground retaining wall and increase the stabilization of foundation pit excavation in combination of underground retaining walls and jet grouting.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127