检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河池水利电力勘测设计研究院,广西河池547000 [2]广西电力工业勘察设计研究院,南宁530023
出 处:《红水河》2007年第2期1-6,共6页Hongshui River
摘 要:龙江下桥水电站拦河拱坝处在背斜轴部,河床岩石破碎,抗冲能力低,厂坝之间相距近,用此前传统单坎式水垫塘,因消能效率低,不利坝基坝肩安全,也不能为电站尾水渠提供良好水力条件。作者重点叙述“三坎式水垫塘”产生的背景、依据与效果;介绍水垫塘结构设计要点与三年来泄洪消能工初期运行情况。The arch dam of Xiaqiao Hydropower Station in Longjiang River is located in axial region of anticline where there are crashed rocks at the river bed. As the dam has a low erosion-resisting capacity and is adjacent to the plant, the traditional single-ridge plunge pool with a low energy dissipation efficiency can neither ensure the safety of dam foundation and abutment nor provide sound hydraulic conditions for the tailrace of the power sta- tion. The background, reference and effect of three-ridge plunge pool are presented in details together with the design gist of plunge pool structure and the preliminary operating status of flood discharging energy dissipation over the Past three vears.
关 键 词:拱坝 消能防冲 冲击式消力池 三坎式水垫塘 下桥水电站
分 类 号:TV653[水利工程—水利水电工程] TV135.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.18