千岛湖大桥钢管混凝土拱桥拱肋混凝土徐变效应研究  

Research on Concrete Creep Effect of CFST Arch Rib Concrete of Qiandao Lake Bridge

在线阅读下载全文

作  者:陈少峰[1] 杨大伟[2] 杨小森[1] 

机构地区:[1]北京工业大学,北京市100022 [2]哈尔滨工业大学,哈尔滨市150090

出  处:《公路》2007年第6期32-35,共4页Highway

摘  要:结合千岛湖大桥施工及成桥的长期监测项目,通过实测数据分析,探讨了大跨径钢管混凝土拱结构的徐变效应问题。提出了实测弹性计算比的概念,根据该指标的分析,总结出四肢格构式钢管混凝土拱结构的长期受力状态和规律。这些结论和分析方法无论是对于钢管混凝土拱的徐变分析,还是大跨径钢管混凝土的拱桥设计,都提供了有益的参考。Combined with the construction and the long-term monitoring project of the Qiandao Lake Bridge, the creep effect of long span concrete-filled steel tubular (CFST) arch bridge structure is discussed through measured data, the concept of the ratio of measurement and elastic calculation is proposed and then the long-term stressing condition and rule of the four-limb trellis type CFST arch structure are summarized according to that target analysis. In a word, these conclusions and analysis method provide beneficial reference either to the creep analysis of CFST arch structures or to the design of long span CFST arch bridge structures.

关 键 词:钢管混凝土拱桥 徐变效应 长期监测 实测弹性计算比 

分 类 号:U448.222[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象