检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《桥梁建设》2007年第3期56-59,共4页Bridge Construction
摘 要:京沪高速铁路北京特大桥在跨京开高速公路时,为满足立交要求并追求较好的景观效果,采用了(32+108+32)m中承式钢箱拱。着重对主梁高度、桥面板形式、桥面系结构形式、吊杆间距、拱肋中心距、吊杆形式、边墩负反力及主墩水平推力处理方案等进行优化比选。At the location where the Beijing Bridge on Beijing-Shanghai High-Speed Railway spans Beijing-Kaifeng Expressway, to meet the requirements for grade separation there and to seek for better effect of aesthetics, the type of a half-through steel box arch bridge with spans (32 +108+32) m was adopted in the design, and the handling schemes for various structural parts of the bridge, such as the main girder depth, deck slab types, floor system, suspender spacing, arch rib c/c distance, suspender types, negative reaction forces on the side piers and horizontal thrust form the main piers were mainly compared and optimized.
关 键 词:京沪高速铁路 中承式桥 钢箱拱 组合结构 桥梁设计
分 类 号:U448.213[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.247.220