深圳市邮电信息枢纽大厦演示厅钢骨梁吊装技术  被引量:1

HOISTING TECHNOLOGY FOR THE STEEL BEAM OF DEMONSTRATION HALL IN SHENZHEN POSTAL INFORMATION COMPLEX BUILDING

在线阅读下载全文

作  者:王旭峰 杨伯初 

机构地区:[1]深圳市第一建筑工程有限公司,广东深圳518029

出  处:《建筑技术》2007年第7期530-532,共3页Architecture Technology

摘  要:工程中钢骨重量超过塔吊起重能力,考虑塔吊的额定允许荷载、吊装距离、现场条件等因素,采用加工车间分段加工制作、现场分段吊装拼接的施工工艺,并结合先进的有限元程序对拼装工况进行模拟计算,加快了施工进度,保证了施工质量和安全,并且节约施工成本。As the weight of steel frame beam exceeded the capacity of the tower crane, after the permissive load of the crane, the hoisting distance and site conditions and etc. being taken into account, it was decided that the beam would be manufactured in segments in the workshop, then hoisted and assembled one by one on site. Moreover, FEM program was employed to simulate the working conditions of assembly. It accelerated construction schedule, ensured the quality and safety, and saved the costs.

关 键 词:钢骨梁 分段吊装 工况分析 

分 类 号:TU758[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象