砖混结构煤仓及皮带走廊拆除控制爆破  被引量:1

THE DEMOLITION OF COAL BUNKER AND ITS BELT CORRIDOR IN BRICK CONCRETE STRUCTURE BY CONTROLLED BLASTING

在线阅读下载全文

作  者:宗琦[1] 傅菊根[1] 徐颖[1] 吕渊[1] 

机构地区:[1]安徽理工大学,安徽淮南232001

出  处:《工程爆破》2007年第2期61-64,共4页Engineering Blasting

摘  要:根据待拆除煤仓、皮带走廊的结构特点和拆除要求以及其周围的环境条件,设计煤仓和皮带走廊同时爆破拆除,并于爆破前将两者被拆与保留部分采用爆破和人工的方法预先解体,煤仓向北倾倒,走廊原地塌落。同时进行了参数、爆破网路等合理设计和精心施工,加强安全防护,拆除爆破达到了预想效果。Based on the structural features of coal bunker and its belt corridor and the requirement from the demolition engineering and the environmental conditions, the program of simultaneously demolishing the bunker and its belt corridor was designed. The both were manually divided before blasting. The coal bunker collapsed towards the north and the corridor collapsed in situ. The blasting parameters,ignition network and so on were conducted carefully. Expected demolition results were obtained.

关 键 词:煤仓 皮带走廊 拆除爆破 预处理 

分 类 号:TU746.5[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象