检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:RUAN Shi-ping WU Jian-hua WU Wei-wei XI Ru-ze
机构地区:[1]College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China, [2]Anhui Institute of Hydraulic Research, Bengbu 233000, China
出 处:《Journal of Hydrodynamics》2007年第3期330-334,共5页水动力学研究与进展B辑(英文版)
基 金:Project supported by the National Natural Science Foundation of China (Grant No. 50539060);the Innovative Project of Graduate Student in Jiangsu Province (Grant No.2005-60).
摘 要:The selection of the configuration and size of an aerator was of importance for a tunnel spillway under the conditions of high speed flows. Experimental investigations were conducted on the effects of entrained air on the tunnel spillway in the Goupitan Project, based on the criterion of gravity similarity and the condition of aerated flow velocity of over 6 m/s, with physical models. The configurations of the aerators were presented of a larger bottom air concentration, to protect the tunnel spillway from cavitation as well as to see no water fills in the grooves.The selection of the configuration and size of an aerator was of importance for a tunnel spillway under the conditions of high speed flows. Experimental investigations were conducted on the effects of entrained air on the tunnel spillway in the Goupitan Project, based on the criterion of gravity similarity and the condition of aerated flow velocity of over 6 m/s, with physical models. The configurations of the aerators were presented of a larger bottom air concentration, to protect the tunnel spillway from cavitation as well as to see no water fills in the grooves.
关 键 词:CAVITATION AERATOR air concentration tunnel spillway the Goupitan Project
分 类 号:TV651.1[水利工程—水利水电工程] TV131
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222