关于对山西中部220kV电网解网目标的思考  

Thought of Unting Aim about the 220 kV Network in Shanxi Central Section

在线阅读下载全文

作  者:张琳娜[1] 王皑[1] 李强[1] 

机构地区:[1]山西省电力公司,山西太原030001

出  处:《山西电力》2007年第3期54-56,共3页Shanxi Electric Power

摘  要:针对山西中部220 kV双环网中部分厂、站短路电流水平超标或接近断路器额定遮断容量的问题,主要从电网结构来分析,通过必要的电气计算,提出中部220 kV双环网解网的思路和目标。With the continuously increasing of power installation in Shanxi central section and continuous development of Shanxi network, short-circuit lever of some power plants and transformer substations in Shanxi central section has gone beyond or approached rating shutoff capacity of switches, and controlling short-circuit lever has became a important reference guideline in programing and designing project. This article mainly analyses from the structure of grid and studies the thought and aim about unting the 220 kV network in the period of 2006-2010.

关 键 词:电网 短路电流 解网 

分 类 号:TM727.2[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象