上海浦东国际机场二期航站区密集长桩施工技术  

Construction Technology of Congested Long Piles for Terminal Section Works of Shanghai Pudong International Airport Phase Ⅱ Project

在线阅读下载全文

作  者:乐敏 张振华 胡小锋 

机构地区:[1]上海市基础工程有限公司,200002 [2]上海建工浦东国际机场二期工程总承包部,201202

出  处:《建筑施工》2007年第2期96-98,共3页Building Construction

摘  要:上海浦东国际机场二期航站楼为低承台群桩基础。针对地基土层中持力层落差大及满足主体工程按期开工的工期要求,为避免密集群桩在沉桩过程中,由于挤土效应而影响沉桩质量和桩位精度,论述了选择合适的桩型、沉桩流水、桩位复测时机及长桩在施打过程中防桩顶破碎等技术措施。Old English was not an entirely uniform language. Not only are there differences between the language of the earliest written records (about A.D. 700) and that of the later literary texts, but the language differed somewhat from one locality to another. Four Principal dialects were spoken in Anglo-Saxon England: Kentish, West Saxon, Mercian, and Northumbrain. This paper will explore the classification, the distribution and the features of old English dialects.

关 键 词:密集群桩 地基土层 挤土效应 桩型沉桩流水 桩位 桩顶保护 

分 类 号:TU248.6[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象