检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卢伟华[1] 张健[1] 范波芹[2] 胡建永[1]
机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]浙江省水利水电技术咨询中心,浙江杭州310012
出 处:《水电能源科学》2007年第4期90-93,44,共5页Water Resources and Power
基 金:国家自然科学基金资助项目(50179008);教育部博士基金资助项目(20010294006);水资源与水电工程科学国家重点实验室开放基金资助项目(2003B005)
摘 要:针对水电站长引水道系统机组导叶的关闭规律,根据涌浪压力及水锤压力的不同性质,提出了合理统筹调压室断面面积、阻抗孔口尺寸、关闭时间三者的优化方案。同时指出在可研阶段优化导叶关闭规律存在较多的不确定性因素,还应结合关闭规律的敏感性分析以得到一个鲁棒性较好的关闭规律。According to different properties of surging pressure and water hammer pressure, relationship among of area of surge tank, size of throttling orifice and closure time should be taken into account during optimization of vane closure law in the long-distance convey tunnel system. The optimization scheme that consider the three factors simultaneously is designed. In addition, during the stage of designing many uncertainty factors exist in the optimization of vane closure law. The vaue closure law with good robust can be obtained using sensitive analysis of vane closure low.
分 类 号:TV732.56[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222