长引水道系统调压室体型与导叶关闭规律优化  被引量:3

Optimization of Body-type of Surge Tank and Vane Closure Law under the Long-distance Convey Tunnel of Hydropower Station

在线阅读下载全文

作  者:卢伟华[1] 张健[1] 范波芹[2] 胡建永[1] 

机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]浙江省水利水电技术咨询中心,浙江杭州310012

出  处:《水电能源科学》2007年第4期90-93,44,共5页Water Resources and Power

基  金:国家自然科学基金资助项目(50179008);教育部博士基金资助项目(20010294006);水资源与水电工程科学国家重点实验室开放基金资助项目(2003B005)

摘  要:针对水电站长引水道系统机组导叶的关闭规律,根据涌浪压力及水锤压力的不同性质,提出了合理统筹调压室断面面积、阻抗孔口尺寸、关闭时间三者的优化方案。同时指出在可研阶段优化导叶关闭规律存在较多的不确定性因素,还应结合关闭规律的敏感性分析以得到一个鲁棒性较好的关闭规律。According to different properties of surging pressure and water hammer pressure, relationship among of area of surge tank, size of throttling orifice and closure time should be taken into account during optimization of vane closure law in the long-distance convey tunnel system. The optimization scheme that consider the three factors simultaneously is designed. In addition, during the stage of designing many uncertainty factors exist in the optimization of vane closure law. The vaue closure law with good robust can be obtained using sensitive analysis of vane closure low.

关 键 词:长引水道系统 水锤 调压室涌浪 关闭规律 

分 类 号:TV732.56[水利工程—水利水电工程]

 