检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:衣立东 YI Li-dong (Northwest China Grid Company, Xi'an 710048, China)
出 处:《电网与水力发电进展》2007年第3期8-12,共5页
摘 要:在分析我国目前最高电压等级750kV输变电示范工程建设的技术难点和特点的基础上,研究了利用科研成果中的技术创新在工程设计、设备制造、施工及验收中的应用,为后续750输变电工程和国家电网特高压输变电工程的建设提供了技术参考。Based on the analysis of the technical difficulties and features for 750 kV Transmission and Transformation Demonstration Project, Which is the highest voltage level in China at present,the application of technical innovation obtained in the research achievements in the aspect of project design, equipment manufacture, construction and acceptance are studied, which has provided technical reference for the construction of future 750 kV transmission and transformation project as well the ultra-high voltage project of State Grid.
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222