三里坪水电工程泄洪洞出口挑流鼻坎的优化试验研究  被引量:2

An Optimum Experiment Research of Flip Bucket of Sanliping Hydropower Project flood-Releasing Tunnel Outlet

在线阅读下载全文

作  者:刘晓芳[1] 余明辉[1] 兰才胜[1] 何双[1] 

机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,武汉430072

出  处:《南水北调与水利科技》2007年第4期76-79,共4页South-to-North Water Transfers and Water Science & Technology

基  金:国家"973"计划资助项目(2003CB415206)

摘  要:通过建立了三里坪水电工程整体水工物理模型,对泄洪洞出口挑流鼻坎的型式进行了多方案对比优化试验,试验结果表明,优化后的挑流出口型式可使得出流充分消能,且无论在高水头或低水头时均无溅击建筑物所在岸边的现象发生,可保证泄水建筑物的安全,并作为工程设计的科学依据。In the Sanliping hydropower project integer hydraulic physical model ,many kinds of optimum design for the flip bucket pattern of flood- releasing tunnel outlet are compared , and the conclusions are as follow. energy dissipation of outflow nappe is sufficient after optimum, scouring of the nearer bank doesn't occur both at high water level and at low water level. That ensure security of flood-releasing structure. According to the project fact, it can be the scientific foundation of the project design.

关 键 词:挑流消能 泄洪洞 出口型式 

分 类 号:TV135.2[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象