检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东北大学信息科学与工程学院,辽宁沈阳110004
出 处:《系统仿真学报》2007年第15期3534-3539,共6页Journal of System Simulation
基 金:国家自然科学基金项目(60274099);教育部博士点基金项目(20020145007)
摘 要:提出了一种同时考虑居民不满意度和断电经济损失的错峰控制短期断电计划的多目标新模型。首先构造了居民的不满意度函数,其次,对两个单目标确定性模型求解得到目标函数值;最后,对目标值进行一定程度的伸缩,采用非线性规划方法求解,得到新的工业区以及居民区断电情况。仿真结果表明,提出的新策略在各自单目标优化值轻微伸缩的情况下使双目标综合考虑效果更好,该策略对可持续发展战略和错峰控制限电分配中多因素公平性有重要现实意义。A novel multi-objective optimal short-term power terminates planning in a power system was proposed. Both dissatisfaction degree of dwellers and economic loss were considered in this model. At first, the dissatisfaction degree function of dwellers was constructed; secondly, each single-objective deterministic model was solved so that its objective value was obtained along with the results of unit commitment and power dispatch; finally, the multi-objective programming problem was reformulated into nonlinear Single objective programming problem so as to get the power limiting distribution of each zone. The numerical results demonstrate that the scheme obtained from the multi-objective model can meet functions better than that obtained from the single-objective deterministic model with slight variation in the every single-objective. This method of decision making is significant for sustainable development strategy and the multi-factor justice of power limiting distribution for peak load shifting control planning.
分 类 号:TP391.9[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40