检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安交通大学管理学院
出 处:《管理学报》2007年第4期384-389,392,共7页Chinese Journal of Management
基 金:国家自然科学基金资助项目(70371037)
摘 要:针对经济批量排产问题假定生产可以在库存降为0之前开始,并且提出新的算法求产品的生产顺序。结果表明,该排产方法成本要低于其他2种常用的经济批量排产问题的方法,并且给出了算法的时间复杂性。It is frequent occurrence in chemical, paper, pharmaceutical, steel industries that multiple products will be produced on a single facility or assembly line. Thus, schedule is necissary to minimize cost and satisfy demand. This kind of problem often referred to as economic lot scheduling problem (ELSP). Being different from the past studies, the situation where the production of a product may be started before the inventory level drops to zero is considered. Besides, a new algorithm is proposed to produce production sequence. A Benchmark numerical example shows the approach can obtain lower cost than that obtained by using basic period approach or common cycle approach. The algorithm for time complexity is also given.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117