检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏婷婷[1] 陈尧隆[1] 陈培培[1] 郭磊[1] 辛杨[2] WEI Ting-ting, CHEN Yao-long, CHEN Pei-pei, GUO Lei, XIN Yang (1.Facuhy of Water Resources and Hydraulic Power, Xi'an University of Technology, Xi'an 710045, China; 2. Northwest Institute Electric Power Design,Xi'an 710075, China)
机构地区:[1]西安理工大学水利水电学院,陕西西安710048 [2]西北电力设计院,陕西西安710075
出 处:《电网与水力发电进展》2007年第4期65-67,共3页
摘 要:本文以高寒地区某碾压混凝土重力坝为例,采用等效厚度法和三维有限元浮动网格法,分别计算有保温和无保温两种方案,研究表面保温对混凝土温度和温度应力控制的作用。计算结果表明,表面保温对控制混凝土表面温度效果明显。Taking some RCC gravity dams in the high-cold area as the examples for adopting the equivalent thickness method and the 3-D finite element relocating mesh method, the calcucation was carried out with and without heat insulating respectively, to study the function of the insulating layer of controlling concrete temperature and temperature stress. It was shown by the results of calculation that the insulating layer played a significant role in controlling concrete temperature.
关 键 词:碾压混凝土坝 等效厚度法 三维有限元浮动网格法 表面保温 温度应力
分 类 号:TV642.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62