那吉电站尾水渠右岸边坡挡土墙设计  被引量:1

Extra-high earth-retaining wall design for tail channel right bank slope of Naji Navigation Complex

在线阅读下载全文

作  者:钟华[1] 邓敏[1] 

机构地区:[1]广西水利电力勘测设计研究院,广西南宁530023

出  处:《广西水利水电》2007年第4期3-7,共5页Guangxi Water Resources & Hydropower Engineering

摘  要:分析了那吉航运枢纽工程发电厂房尾水渠右岸挡土墙的地质条件,针对挡土墙挡土高度大、基础地质条件差的特点,通过方案比较,采用混凝土衡重式挡土墙结构,应用材料力学方法对挡土墙进行抗滑、抗倾覆、应力分析,确定了挡土墙最佳断面型式。An analysis was made on the geological conditions of the right bank earth-retaining wall at the powerhouse tail channel of Naji Navigation Complex. In view of the characteristics of the earth-retaining wall including great height and poor foundation geological conditions, counter-weight concrete earth-retaining wall structure was determined by scheme comparison. Based on an analysis of the sliding resistance, safety against overturning and stress of the earth-retaining wall made by material mechanics method, the optimum cross section type was determined for the wall.

关 键 词:那吉航运枢纽工程 衡重式挡土墙 稳定分析 最佳断面 

分 类 号:TV31[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象