二沉池污泥上浮原因分析及处理对策  被引量:2

ANALYSIS OF UPWARD FLOATING OF SLUDGE IN SECONDARY SETTLEMENT PIT AND COUNTERMEASURES

在线阅读下载全文

作  者:佟立华[1] 王基成[1] 鲁军[2] 李玉道[1] 

机构地区:[1]中国石化齐鲁分公司,山东省淄博市255408 [2]华东理工大学,上海市200237

出  处:《炼油技术与工程》2007年第1期55-58,共4页Petroleum Refinery Engineering

摘  要:针对齐鲁乙烯污水处理场Ⅲ,Ⅳ系列二沉池污泥上浮问题,通过对曝气池、二沉池参数、曝气池活性污泥性质以及污水处理场的运行及污水来水等影响因素分析研究,寻找开工初期污泥上浮的原因。结果表明:进水pH值、温度、高COD负荷、有毒物质冲击、高DO浓度及排泥不畅等因素导致了污泥上浮。提出了对策,运行结果证明是可行的。To solve sludge floating problem in secondary settlement pits in No. Ⅲ and Ⅳ systems of waste water treatment plant of Qilu Company, SINOPEC, the operating parameters of aeration pit and secondary settlement basin, the activated sludge properties, the operation of waste treatment plant and sources of waste water were analyzed to find out the causes of sludge floating at the start of run. The results exhibited that the pH value of intake water, temperature, high COD, impingement of poisonous materials and improper discharge of sludge were responsible for sludge floating. Practical countermeasures were recommended and proved to be effective in operation.

关 键 词:乙烯装置 沉淀池 污泥 上浮 污水处理 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象