检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南大学土木工程学院
出 处:《湖南大学学报(自然科学版)》2007年第8期6-10,共5页Journal of Hunan University:Natural Sciences
基 金:国家自然科学基金资助项目(50478051)
摘 要:以某大跨度预应力混凝土斜拉桥为例,采用一阶分析及最优化计算方法来确定斜拉桥的合理施工状态.运用空间非线性有限元分析模型,模拟了混凝土斜拉桥主梁的悬臂浇筑过程,求出各施工阶段斜拉索的初始张拉力和主梁节段的立模标高.研究结果表明,这种方法能将成桥后结构的内力和主梁的线形同时控制在精度范围内.Based on a long-span prestressed concrete cable- stayed bridge of a 370m central span length under construction in China, This paper introduces first-order solution and optimization algorithm to determine the rational construction state. Applying a spatial nonlinear FEM modeling , the actual cantilever construction pro- cess of the cable-stayed bridge concrete girders was simulated, the tension forces of cables and the initialize heights of girders during construction are obtained respectively. The research results show that this method could control the stress of the construction and the line shape of the girder in accurate range at the same time.
分 类 号:U443.38[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.165.235