检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东工业大学,广州510006
出 处:《工程勘察》2007年第9期6-9,25,共5页Geotechnical Investigation & Surveying
基 金:广东省自然科学基金资助项目(06021462)
摘 要:为了保证广州南沙某工程动静力排水固结法处理软土地基的质量及进度,在施工的同时对孔隙水压力、土体分层沉降、十字板抗剪强度、静力触探等指标进行了实时监测和分析。通过实施信息化施工,进行施工质量的过程控制与处理场地的点控制,工程整体加固效果良好,工后各项指标完全达到或超过预期值。In order to guarantee the quality and schedule of the silt ground treatment project for the first stage of Guangzhou Nansha Taishan petrifaction storage area, the parameters such as pore water pressure, stratum settlement, field vane shear strength and the index of static cone penetration are monitored in real time and analyzed while construction. Through the construction with information, the process control of construction quality and the spot control of the treatment field are carried out and the consolidation effect is satisfied.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28