小湾水电站地下厂房岩锚吊车梁模型试验研究  被引量:2

The Model Test of Crane Girder Bolted to Rock in Underground Powerhouse in Xiaowan Hydropower Station

在线阅读下载全文

作  者:赵志勇[1] 邓加林[1] 杨宜文[1] 

机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051

出  处:《云南水力发电》2007年第4期39-43,共5页Yunnan Water Power

摘  要:岩锚吊车梁的设计,目前国内尚无规范可循,传统的计算方法受地质条件和开挖爆破等不确定因素的影响,难以对其进行精确计算。小湾水电站地下厂房岩锚吊车梁进行了1:1模型试验,通过两次常规加载和一次超载试验,对岩锚吊车梁的整体变形特征和安全度进行了评价,指导了岩锚吊车梁的设计和施工。The design of crane girder bolted to rock has no code to conform in China at present. The traditional calcula- tion methods are greatly affected by uncertain factors, such as geological conditions and excavation. Hence it' s hard to be calculated in sophisticated way. The 1:1 scale model test for the crane girder bolted to rock in Xiaowan underground powerhouse are implemented. Through twice traditional loading and once over- loading tests on the crane girder bolted to rock, the integral deformation characteristics and safety are evaluated, these results are positively guide the design and construction of the crane girder bolted to rock.

关 键 词:岩锚吊车梁 模型试验 锚杆应力 加载 小湾水电站 

分 类 号:TU943.9[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象