检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海市政工程设计研究总院大桥设计研究院,上海200092 [2]上海林同炎李国豪土建工程咨询有限公司,上海200092 [3]上海市城市建设设计研究院,上海200125
出 处:《中国市政工程》2007年第4期23-24,26,共3页China Municipal Engineering
摘 要:以某座П形断面预应力混凝土主梁的无背索斜拉桥桥型方案为背景,采用三维实体有限元数值计算方法,分析探讨了自重恒载、活载、轴向力、预应力等荷载及其组合下的剪力滞效应问题。研究该种桥型剪力滞系数的分布规律,计算不同荷载及其组合下剪力滞系数。得到了该种桥型方案剪滞系数的一些重要结论,为该桥型方案的设计计算提供了重要的依据,也为同类桥型的剪力滞效应计算提供了参考资料。With the background of a cable-stayed bridge plan, a П type section of prestressed concrete main beam and without back stay, adopting the 3D finite element method, the author analyzed gravity load, live load, axial force, etc. and the shear lag effect problem of these combinations. The distribution rule of the bridge type shear lag coefficient, the calculation of different load and these combinations were also studied in this paper. A lot of important results were gained, which provided foundations for the design calculation of the bridge type plan, meanwhile, provided reference for the similar type bridges.
关 键 词:斜拉索 无背索斜拉桥 剪力滞效应 ∏形主梁 有限元法
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222