检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京科技大学冶金与生态工程学院,北京100083 [2]邢台钢铁有限责任公司技术中心,邢台054027
出 处:《北京科技大学学报》2007年第8期845-849,共5页Journal of University of Science and Technology Beijing
摘 要:以邢钢转炉炼钢厂生产运行研究为基础,从物质量基本参数角度,对转炉、LF、连铸机三者的工序产能进行匹配分析和综合研究.运用OPT技术分析得出连铸机是原流程协调运行的"瓶颈",通过对提升连铸机生产能力的三种方法的分析,提出将连铸机由4流增加至5流是适合邢钢工艺的最佳工序产能匹配方案.最后,对中小吨位转炉流程的转炉、LF和连铸机匹配模式进行探讨,认为三者"一一对应"匹配模式是可行的.On the basis of the production run research of a BOF steelmaking workshop, the matching analysis and comprehensive research of productive capacity among BOFs, LFs and CCMs were carried out from the aspect of basic mass flow parameters. Applying OPT technology to this study, the bottleneck of coordinating operation for the previous process was the continuous casting machine (CCM), which was determined through analyzing three ways to enhance productive capacity. The optimized scheme of productive capacity matching for different working procedures was put forward, which was the strands of CCM increased from 4 to 5 in the former process of the steelmaking plant. At last, the matching mode of converters, LFs and CCMs in the medium and small size BOF process was discussed, and the matching mode of one BOF-one LF-one CCM is feasible on some condition.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.118