机构地区:[1]西安热工研究院有限责任公司,西安市710032 [2]华能杨柳青热电有限责任公司,天津市300380
出 处:《电力建设》2007年第9期70-72,75,共4页Electric Power Construction
摘 要:新建变压器的差动保护投运前要用一次负荷电流来检验二次接线的正确性。受机组建设现场条件制约,目前采用的常规方法都有一定的局限性。而利用电动机启动电流检验差动保护接线的新方法,简便可靠,容易与现场安装施工进度相协调。通过在杨柳青电厂7号机建设的工程实践,验证了该方法的可行性,值得在其他机组建设中借鉴。Before the differential protection of a newly built transformer is put into operation, primary load current must be applied to validate secondary connection. Due to conditionality in construction site, current methods have certain limitations. The new approach, which checks differential protection connection using electromotor starting current, is simple and reliable, and easy to be coordinated with installation schedule. Its feasibility has been validated through Yangliuqing Power Plant No. 7 unit project, and it is worthy of using for reference in other unit constructions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13