750kV示范工程系统调试综述  

Summary of 750 kV Pilot Project System Commissioning Test

在线阅读下载全文

作  者:杨万开[1] 史可琴 范越 万筱钟 牛拴保 印永华[1] YANG Wan-kai,SHI Ke-qin,FAN Yue, WAN Xiao-zhong, NIU Shuan-bao,YIN Yong-hua( 1.China Electric Power Research Institute, Beijing 100085,China; 2.Northwest China Grid Company, Xi'an 710048, China)

机构地区:[1]中国电力科学研究院,北京100085 [2]西北电网有限公司,陕西西安710048

出  处:《电网与水力发电进展》2007年第5期25-29,共5页

摘  要:国家电网公司750kv示范工程系统调试范围为750kv官亭变电站变电工程、750kV兰州东变电站变电工程、750kV官亭变电站至750kV兰州东变电站一条140km的750kV线路。系统调试方案包括两部分:第一部分为750kV输变电示范工程系统调试方案.第二部分为750kV示范工程系统调试测试方案。本文详细叙述了系统调试方案中的试验项目和试验内容:并对系统调试测试项目进行了简单介绍。对系统调试结果进行了简单概括分析,并给出了系统调试结论。The 750 kV transmission pilot project system commissioning test in Northwest of China included GuanTing 750 kV transmission substation, LanZhouDong transmission substation and 750 kV transmission line of 140 km. The contents of 750 kV system commissioning test were divided into two parts. The first part was the 750 kV system commissioning test program, and the second part was the 750 kV system commissioning measurement scheme. The system commissioning test program including test items and test contents were introduced in this paper. The system commissioning measurement scheme was briefly introduced. The results of system commissioning test were briefly analyzed. The conclusions were given in the end.

关 键 词:750 KV示范工程 系统调试方案 系统调试测试方案 系统调试 

分 类 号:TM732[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象