检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:WANG Yong SONG Qinbao SHEN Junyi
机构地区:[1]Department of Computer Science, Xi'an Jiaotong University, Xi'an 710049, Shaanxi, China
出 处:《Wuhan University Journal of Natural Sciences》2007年第5期927-931,共5页武汉大学学报(自然科学英文版)
基 金:Supported by the National Natural Science Foundation of China (60673124);the National High Technology Research and Development Program of China (863 Program)(2006AA01Z183).
摘 要:The software stage-effort estimation can be used to dynamically adjust software project schedule, further to help make the project finished on budget. This paper presents a grey model Verhulst based method for stage-effort estimation during software development process, a bias correction technology was used to improve the estimation accuracy. The proposed method was evaluated with a large-scale industrial software engineering database. The results are very encouraging and indicate the method has considerable potential.The software stage-effort estimation can be used to dynamically adjust software project schedule, further to help make the project finished on budget. This paper presents a grey model Verhulst based method for stage-effort estimation during software development process, a bias correction technology was used to improve the estimation accuracy. The proposed method was evaluated with a large-scale industrial software engineering database. The results are very encouraging and indicate the method has considerable potential.
关 键 词:project management software engineering sorftware effort estimation grey model
分 类 号:TP311.5[自动化与计算机技术—计算机软件与理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249