检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁隧道股份有限公司,河南新乡453000 [2]中铁隧道集团有限公司,河南洛阳471009
出 处:《隧道建设》2007年第4期57-59,64,共4页Tunnel Construction
摘 要:结合厦门翔安海底公路隧道陆域段大断面全-强风化花岗闪长岩隧道开挖施工工法、施工组织和机械化施工配套技术等施工手段的实施情况,介绍了大断面隧道CRD工法施工对该地层的适应性和实现安全快速施工的技术措施和机械配套技术。The coast land portion of Xiang' an sub-sea highway tunnel in Xiamen has large cross-section and is located in fully -heavily weathered granodiorite. The construction methods, construction organizations and machinery matching for the coast land portion of Xianghn tunnel are presented in the paper. The applicability of CRD construction method for large cross-section tunnels located in such geological conditions and the technical measures and machinery matching technology taken to achieve safe and rapid tunnel construction are focused in the paper.
分 类 号:U455.4[建筑科学—桥梁与隧道工程] U459.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30