高压断路器三相合成试验方法的研究  被引量:10

Three-phase synthetic test method of high voltage circuit breaker

在线阅读下载全文

作  者:苑舜[1] 于力[1] 蔡志远[1] 王金辉[2] 

机构地区:[1]沈阳工业大学电气工程学院 [2]沈阳高压开关厂虎石台实验站,沈阳110000

出  处:《沈阳工业大学学报》2007年第4期404-408,共5页Journal of Shenyang University of Technology

摘  要:基于前人对电流零点预测工作的研究成果,保证了电流引入时间的准确性,将单相合成试验采用的电流引入法借鉴到三相合成试验,实现三相电流并联引入.在此基础上,采用MAT-LAB/SIMULINK软件对三相合成试验线路仿真模型进行搭建,并对仿真结果做了进一步的分析研究.结果表明:首开相和两个后开相瞬态恢复电压值,及并联电流的投入时刻对实验的等价性起到至关重要的影响.因此,可以利用此仿真模型,通过对这几个参数的调节获得预期瞬态恢复电压值,节省实验投资并可为国内高压实验站进行三相合成实验提供理论依据.Based on the work of current zero crossing forecasts, the accuracy of current introducing time was guaranteed. The current introducing method of single-phase synthetic test was adopted by three-phase synthetic test to realize three-phase current parallel introducing. The simulation model of three-phase synthetic test was performed using the commercial software MATLAB/SIMULINK. The simulation results were further analyzed. From the simulation results, it can be seen that the test equivalence is related to the transient recovery voltages of first breaking pole, two last breaking poles, and the time of shunt current introducing. Therefore, the anticipated transient recovery voltage can be obtained by the simulation model The method can reduce investment outlay of experiment and can offer the theoretical base for domestic high voltage experimental establishments.

关 键 词:零点预测 电流引入法 三相合成试验 首开相 瞬态恢复电压 

分 类 号:TM561.3[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象