检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072
出 处:《泥沙研究》2007年第5期30-35,共6页Journal of Sediment Research
基 金:国家973项目(2003CB415200)
摘 要:以芦家河浅滩段为例,讨论了长江中游沙卵石河段坡陡流急碍航现象的治理对策。数学模型对多种整治方案的效果模拟表明,挖槽的横向、纵向尺度不同,其对坡陡流急缓解效率、上游水位下降程度方面存在明显差别。下游水位降幅也对开挖工程量、工程效果及上游水位下降具有重要影响。因此,坡陡流急河段的治理需要综合权衡上下游以及本地河床形态等多方面因素,实现系统整治。With the case of Lujiahe shoal reach, discussion on countermeasures high gradient slope and large flow velocity is presented shows that the effect of dredging project is restricted width of the dredge area, not only the upstream water in this paper. Numerical to the navigation issues related to simulation under different scenarios by its dimensions. With different composition of length and level drop but also the extent of the high gradient and high velocity is different. Additionally, volume and effect of the dredging engineering downstream water level lowering. Considering all these factors, i reach should be proposed on a synthetic foundation including both t is suggested that rely much on the regulation the degree of project of this upstream and downstream reach environment and morphology in the local reach.
分 类 号:TV147[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.132.143