检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油天然气管道工程有限公司
出 处:《油气储运》2007年第9期55-56,共2页Oil & Gas Storage and Transportation
摘 要:介绍了中哈原油管道沼泽地区施工的情况,针对该工程在穿越阿亚古兹河沼泽和腾杰克河东西岸沼泽遇到的问题,采取了在管沟两侧50m范围内修筑拦水坝,每隔6m设置压重块,每焊接完3000m钢管就及时下沟等有效施工措施。对今后管道在沼泽地区施工有一定的指导意义。This paper introduces the swamp pipeline construction course of Sino-Kazakhstan Oil Pipeline. Atasu-Alashankou Oil Pipeline,the first phase project of Sino-Kazakhstan Oil Pipeline,is 9622km in total length, approximately 960km in Kazakhstan, which will cross over the swampland around Ayaguz River and Tentek River. The swamp oil pipeline construction technique is as follows:(1) build up cofferdam on both sides of the pipe ditch (50 m-wide) to block off water; (2) install saddle weight al every 6 m interval and (3) lower down the welded pipe every 3000 m in length. The authors consider that the experience in swampland pipeline construction is valuable for similar pipeline project.
分 类 号:TE973.6[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28