检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江省舟山连岛工程建设指挥部,浙江舟山316000 [2]中铁大桥局集团桥科院有限公司,湖北武汉430034
出 处:《世界桥梁》2007年第3期72-75,共4页World Bridges
摘 要:西堠门大桥南锚碇为重力式嵌岩结构,混凝土方量大,为典型的超大体积混凝土块体。通过精选混凝土配料,优化混凝土配合比;视气温情况调整混凝土入仓温度,控制混凝土温度峰值;合理埋设冷却水管,结合监测控制冷却水进水温度和流量;重视保温、养护等措施,降低水化热,减小混凝土的绝热温升,确保混凝土质量。The south anchorage of Xihoumen Bridge is a gravity type rock-embedded structure east with large cubic amount of concrete and is typically a very massive concrete block. The hydration heat and isolated temperature rise of the concrete for the anchorage were well lowered and the quality of the concrete has been ensured through taking a series of technical measures, such as those of careful selection of the materials, optimization of the mix proportioning for the concrete, adjustment of the concrete temperature in formwork in variation with atmospheric temperatures, control of the concrete temperature peak values and proper layout of the cooling water pipes in the concrete together with monitoring and control of the inlet cooling water temperature and water flow, and close attention to the temperature isolation and concrete curing.
分 类 号:U445.57[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222