检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]无锡电力公司,江苏省无锡市214000 [2]上海三原电缆附件有限公司,上海市201206 [3]上海电缆研究所,上海市200093
出 处:《电力设备》2007年第9期6-11,共6页Electrical Equipment
摘 要:介绍了排管敷设方式的交联电缆载流量的理论计算,包括单根电缆,等负载等截面多根电缆,负载不等、线芯截面不同的电缆,部分电缆等截面、等负载,部分电缆不等负载、不同截面的4种情况下埋地排管敷设方式的电缆载流量计算公式,并与无锡供电公司排管敷设载流量试验结果相比较,理论计算值与试验值误差不超过7%,符合工程需要。The paper introduced theoretical calculation of steady current-carrying capacity for XLPE cable of duct laying, including the cable current-carrying capacity calculation formula under 4 kinds of condition of duct laying, such as single cable; multi cable of equal load and equal section; the cable with different load and line core section; partial cables with equal load and equal section and partial cables with different load and line core section. The comparison with test result of current-carrying capacity for XLPE cable of duct laying in Wuxi Power Supply Co. shows that the error between theoretical calculation and test value does not exceed 7%, which accords with the needs of project.
分 类 号:TM247[一般工业技术—材料科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30