下穿既有公路的土江冲隧道双层管棚设计及监测分析  被引量:18

Double-layer pipe roofing design and monitoring for Tujiangchong tunnel under-crossing an existing highway

在线阅读下载全文

作  者:钟放平 

机构地区:[1]湖南省常吉高速公路建设开发有限公司,常德415100

出  处:《现代隧道技术》2007年第4期36-40,共5页Modern Tunnelling Technology

基  金:湖南省交通科技项目(200436)

摘  要:位于常-吉高速公路上的土江冲隧道是一座下穿既有公路的四车道连拱隧道,施工中为了控制地面沉降,在洞口段采用双层管棚作为辅助施工方法,保证了隧道施工安全和319国道的畅通;在隧道开挖过程中,掌子面附近的管棚变形最大,隧道开挖纵向影响范围为1.5~2.0倍开挖高度。文章介绍了管棚设计、施工情况和监测结果。This article introduces the double - layer pipe roofing design, construction and monitoring for the four - lane double arch Tujiangchong tunnel under - crossing an existing highway. The double - layer pipe roofing as a subsidiary construction approach ensured the safe completion of the tunnel and the smooth commissioning of the national trunk highway No. 319. During the tunnel excavation the pipe roofing deformed most seriously near the face, the longitudinal affected extent of tunnel excavation was 1.5 - 2.0 times the excavation height.

关 键 词:公路隧道 洞口段施工 管棚支护 变形监测 下穿既有公路 

分 类 号:U456.3[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象