检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长春工程学院勘查与测绘学院 [2]辽宁省国际工程咨询中心,沈阳1100004 [3]东煤建筑基础公司,长春130026
出 处:《地质找矿论丛》2007年第3期232-235,共4页Contributions to Geology and Mineral Resources Research
基 金:长春工程学院自然科学科研基金(项目编号:32003005)资助
摘 要:沉管压浆成桩承载力机理分析得知,压浆桩主要通过挤密、胶结、压浆劈裂和渗透、扩径作用来提高单桩承载力。设计了压浆成桩机具系统,确定了合理的压浆成桩施工流程和二次压注浆工艺参数。经对比分析认为,沉管压浆成桩法不仅可以实现桩型的转换、降低桩长、减少工程成本,而且可以改善桩周的边界承载条件,提高单桩承载力。 Analysis and research of the pressure mud vibro mechanism show that the pressure mud vibro can improve the load-bearing capacity through crowding,gluing,splitting diameter expanding.According to the mechanism a new machine tool system is designed and the proper pressure mud piling chart and the second pressure mud parameter are established.Compared to the normal method the new one mot only realizes conversion of pile type,reduction the pile length and lowering the cost but also improve the peripheral condition and load-bearing capacity.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117