双卸压槽法修复破裂井壁机理分析  被引量:2

Mechanism analysis of Double Pressure-release Troughs Method to repair the broken wall of vertical shaft

在线阅读下载全文

作  者:蔡海兵[1] 虞卓亮 

机构地区:[1]安徽理工大学,安徽淮南232001 [2]金华锦绣建筑有限公司东阳分公司,浙江东阳322100

出  处:《矿业工程》2007年第5期18-20,共3页Mining Engineering

摘  要:介绍了深厚表土层竖井井壁破裂机理的研究现状,指出底部含水层疏水沉降是导致井壁破裂的主因,并通过理论分析和数值模拟,研究了双卸压槽法修复破裂井壁的机理。并将研究成果应用于山东某矿副井井壁的修复工程,实践表明效果良好,为井壁破裂治理提供了参考依据。The research status of wall break mechanism of vertical shaft having deep overburden is explained. It is pointed out that dewatering of water- bearing strata at bottom of shaft is main reason for shaft wall break. The mechanism of repairing broken wall of shaft using Double Pressure-release Troughs Method is studied through theoretical analysis & data simulation. The results of study are applied to repair engineering of broken wall of a auxiliary shaft in Shandong province, achieving good performance. The successful practice provides reference basis for similar cases of broken wall repair.

关 键 词:井壁破裂 双卸压槽法 数值模拟 修复 

分 类 号:TD322.5[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象