人工湿地生态修复旅游景区污染水体的研究  被引量:1

Purification of polluted pond water of a tourist attraction by integrated wetland and plant treatment

在线阅读下载全文

作  者:徐德福[1] 吴建军[2] 罗安程[2] 徐建明[2] 应求实[3] 王华胜[3] 

机构地区:[1]南京信息工程大学环境科学与工程学院,江苏南京210044 [2]浙江大学环境与资源学院,浙江杭州310029 [3]杭州植物园,浙江杭州310007

出  处:《环境污染与防治》2007年第9期693-696,共4页Environmental Pollution & Control

基  金:浙江省科技厅重大项目资助(No.2005E10047;No.2005C13003)

摘  要:提出了采用人工湿地并配合植物操控技术治理旅游景区污染水体,并建立了示范工程。经调试运行,在日处理水量为145 m3条件下,人工湿地对TN、TP、COD和BOD5的去除率分别为63.12%、40.47%、83.07%和73.45%。工程通过2个月的运行,污染水体的水质得到明显改善。该技术为旅游景区和景点的污水治理提供了新途径。The paper presented the results of treating slightly polluted pond water of a Zheiiang tourist attraction in a constructed wetland full of plant growth. The integrated wetland and plant treatment removed major portions of total nitrogen,total phosphorus,COD and BOD5 constituents of the inflow (145 m^3/d) with removal rates of 63. 12%, 40. 47%, 83.07% and 73.45%, respectively. After two-month operation of the integrated wetland and plant treatment system,the water quality was improved significantly. The integrated phyto-wetland system is cost effective for treatment of polluted water in tourist sites.

关 键 词:人工湿地 植物操控技术 污水处理 

分 类 号:X52[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象