检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072 [2]长江水利委员会设计院,湖北武汉430010
出 处:《湖北水力发电》2007年第5期13-15,32,共4页Hubei Water Power
摘 要:杏林湾泄洪排涝隧洞上游连接水库,下游连接外海。试验以特征频率(P=0.02%)时的库水位为依据,研究不同潮水位与泄流量的关系、进出口流态、下游流速分布及消能防冲措施。根据试验成果,推荐用"混凝土+防淘墙+堆石"为消能防冲设施。The tunnel is laid across the sea embankment to release floodwater and drain waterlog from Xinglinwan reservoir to outside sea. Taking the reservoir level with characteristic frequency(p = 0.02% )as test basis to study the relationship between tunnel discharge and tidal stage, the flow condition and velocity distribution at tunnel entrance and exit, the downstream energy dissipation and scour condition. According to the test result, the energy dissipation and anti-scour scheme consisted of "concrete block pitching + anti-scour wall + riprapping" is recommended.
分 类 号:TV131.6[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38