检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
出 处:《水力发电》2007年第9期28-30,46,共4页Water Power
摘 要:布仑口-公格尔水电站是新疆盖孜河段的第一个梯级电站,主要建筑物有首部枢纽、引水隧洞和电站厂房。工程所处地区属高寒地区且地质、地形条件复杂,施工难度较大,为此,对总体布置进行了多方案比选,最终确定了设计方案,即首部坝址选在布仑口湖湖口下游约0.95 km处,坝型为粘土心墙砂砾石坝,引水隧洞选择下线方案,厂房采用地面厂房。The Bulungkol-Gongur Hydropower Station is the first cascade power station in the middle reach of Gez River in Xinjiang, which is composed of three parts, headraee scheme, water diversion tunnel and powerhouse of power station. The station is built in a very cold area with complicated landform and geological conditions, so that its construction is very difficult. The final design is decided with comparing several general layout alternatives, that is, the headraee dam is located in the downstream of Butungkol Lake, 0.95km distance to the mouth of the lake, and is a clay core-wall sandygravel dam. Its diversion tunnel adopts a down-line alternative and its powerhouse adopts the ground powerhouse.
关 键 词:总体布置 高水头电站 长距离引水隧洞 布仑口-公格尔水电站
分 类 号:TV736[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.169.240