检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东省地震局,广州510070
出 处:《华南地震》1997年第2期76-82,共7页South China Journal of Seismology
摘 要:水利工程对水库地震的抗震设防要求事先对水库地震进行预测。预测内容包括蓄水后诱发地震的危险性(可能性)、最大震级、最大震的地点、发生时间以及水库地震对场址地震动参数的影响等。除主震时间的预测外,本文第一作者都曾提出过初步的预测方法[1]。本文认为,水库地震前震波速比异常、非线性灰色模型以及前震系列回归等方法,是预测主震时间的有前途的方法。Reservoir earthquake predicting is required to do a priori by earthquake resistance protection of water conservancy works against reservoir earthquake. The predicting contents include the risk (probability) of induced earthquake after impoundment, maximum magnitude, location and origin time of the mainshock and influence of the earthquake on seismic dynamic parameters etc. The methods of foreshock Vp/Vs ratio anomaly of reservoir earthquake, nonlinear grey system, and foreshock sequence regression etc are considered as those of having a future on the prediction of mainshock origin time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80