南水北调东线淮安四站输水河道穿湖段工程实施方案优化  被引量:1

Implemental Scheme Optimization on the Water Transferring Canal of Huai'an No.4 Pumping Station,Eastern Route of the South-to-North Water Diversion

在线阅读下载全文

作  者:刘连建[1] 单文彬[1] 朱立中[2] 

机构地区:[1]淮安市水利局,江苏淮安223005 [2]淮安市水利勘测设计研究院有限公司,江苏淮安223005

出  处:《南水北调与水利科技》2007年第5期26-27,38,共3页South-to-North Water Transfers and Water Science & Technology

摘  要:通过对南水北调东线第一期工程淮安四站输水河道穿湖段工程优化实施方案的分析,提出在湖泊中建设水利工程需注意的施工工期、施工风险、实施方案、投资控制等问题,对今后类似工程的设计和施工可以起到参考和借鉴作用。The article analyzes the implementation scheme of The Huairan No, 4 pumping station and its water transferring canal on many aspects such as the river-lake connection scheme, scheme optimization on construction, risk controlling during construction, structure of spillage weir, general layout, etc. Also points out the problems that must be paid attention during the implementation of hydraulic structures such as construction period, construction risk, implementation scheme, cost controlling, etc, which can be the guidance for future design and implementation on similar projects,

关 键 词:南水北调 输水河道 实施方案 优化 

分 类 号:TV68[水利工程—水利水电工程] TV22

 