检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李东锋 LI Dong-feng (Division 3 Engineering of Sino Hydro Bureau 3, AnKang 725000, Shaanxi Province, China)
机构地区:[1]中国水利水电第三工程局第三分局,陕西安康725000
出 处:《电网与水力发电进展》2007年第6期86-88,共3页
摘 要:丹江口大坝加高工程是在原坝的基础上进行下游贴坡混凝土和坝顶加高混凝土施工。为改善新老混凝土结合面粘结情况和传递受力情况,需要在老坝体混凝土面上切割出键槽。实际施工中采用了大功率液压圆盘踞切割加钻孔静力膨胀相结合的施工工艺.保证了键槽切割的施工质量和施工进度.又降低了施工成本。The slope protection both upstream and downstream the dam, and heightening dam should be conducted on the base of original concrete dam for DanJiangKou dam. Keyway should be cut on the original concrete in order to improve adhesive bonding and stress status. In practice, high powered hydraulic disc cutter combined with static swelling drill was adopted for construction, which ensured the quality and schedule of construction, and lowered the cost.
关 键 词:丹江口大坝加高工程 盘锯 静态爆破 键槽切割 施工方法
分 类 号:TV642[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3