检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘学武[1] 郭彦林[1] 张庆林[1] 刘禄宇[1]
出 处:《工业建筑》2007年第9期22-29,共8页Industrial Construction
摘 要:CCTV新台址主楼具有"塔楼倾斜"、"空间连体"及"大悬臂"的构成特点。施工过程中"路径"效应对建造过程中以及竣工时结构内力和变形的影响较大,与一次成型下的分析结果存在较大差别,需在结构设计中加以考虑。同时需采取合理的施工方法和措施,以保证施工过程中结构的安全性以及竣工时结构的内力和变形满足设计要求。为此,建立CCTV新台址主楼施工过程分析的有限元模型,对其进行施工全过程跟踪模拟分析,给出施工过程结构的内力发展和变形变化的过程,供设计和施工参考。The new CCTV headquarters consists of two towers leaning 6° off vertical in both directions, a tremendous 14- story-high cantilever joining two leaning towers at the top and a 9-story-high podium at the bottom. Different construction procedures will lead to different internal force and deformation distribution during the construction process in this complex steel structure. They will be locked within the structure and have to be considered in the structural design. It is evident that there is a great difference in internal force and deformation distribution between according to design model one time loading and according to step-by-step construction process. And it is necessary to take reasonable construction procedures and measures to guarantee the internal force and deformation of the construction-completed structure to meet the requirement given by designers. It is presented the internal force and deformation analysis of the CCTV new headquarters during the construction process by employing nonlinear finite element method, and the internal force and deformation distribution locked in the structure is determined. Lots of numerical results have been obtained as guidelines for the erection and construction of the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15